Wednesday, 2 August 2023

Writing Slumping Schedules

 

Slumping Schedules

When slumping fired pieces, it is most often appropriate to use a slow ramp rate to avoid too rapid expansion of the glass that might lead to a break. Most glass breaks on the ramp up are above 300°C/573°F. It is in this range that there is a rapid expansion of ceramic. This means a slow rate is protective for both glass and ceramic moulds.

This slow first ramp rate is followed by the rate determined as appropriate for profile and thickness. The table below gives rates and times for different profiles that are 6mm/0.25” thick. Of course, the slumping temperature will be altered for the glass according to the manufacturer’s stated range. The nature of the mould will also have a big effect on temperature and time. The soak times at the slump soak are those appropriate for the mould. The annealing soaks are related to the profile of the glass.

Slumping Schedules by Profile (Celsius) 6mm thick

Flat Fuse and Contour Tack

Actual thickness

Ramp 1 rate to 260°C

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal as for contour:

6

240

20

240

 

30

9mm


Rounded Tack

Actual thickness

Ramp 1 rate to 260°C

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal as for round tack:

6

150

20

150

 

30

9mm


Sharp Tack

Actual thickness

Ramp 1 rate to 260°C

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal as for sharp tack:

6

120

20

120

 

30

9mm

 

Slumping Schedules by Profile (Fahrenheit) .025" thick

Flat Fuse and Contour Tack

Actual thickness

Ramp 1 rate to 500°F

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal as for:

0.250”

432

20

432

 

30

0.375”


Rounded Tack

Actual thickness

Ramp 1 rate to 500°F

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal for:

0.250”

270

20

270

 

30

0.375”


Sharp Tack

Actual thickness

Ramp 1 rate to 500°F

Soak time (min)

Ramp 2 rate

Slumping  temp. for mould *

Soak time (min)

Anneal for:

0.250”

216

20

216

 

30

0.375”

 

Rates

It is most often best to use a slow ramp rate to at least 500°C/933°F. This avoids the risk of inducing a too rapid differential expansion within the glass as it heats up. Experiments about the first ramp rate have shown firing as for two layers thicker than indicated by the profile schedule provides the best results. 

The rates for the anneal soak and cool are those that are one layer thicker than determined by the schedule for the profile. This has been shown by experimentation to give the best annealing result – i.e., least stress.

Temperatures

The slumping temperature needs to be altered for two factors:

  • ·        the glass according to the manufacturer’s stated range, and
  • ·        the nature of the mould.

Many manufacturers are giving recommended temperatures and times for slumping in their moulds. An example is the Bullseye “Quick Tip” which gives suggested temperatures and times for various sizes and natures of moulds that can form the basis of your independent scheduling of slumps. The rates are normally for flat uniformly thick pieces. This will need alteration for tack profile pieces.

Take note of the soak time in these recommendations. If it is less than 10 minutes, it is possible to reduce the temperature by about 10°C/18°F by using a 30-minute soak. This will reduce marking on the back of the glass.

Soaks / Holds

Slumping schedules tend to be more imprecise than many other operations in kilnforming because of variations in moulds and what is placed on them. This, consequently, makes observation of the slump more important. It is needed from a point below the target temperature – say 22˚C/40°F – to ensure the slump is stopped when it is complete, or extended if not. The controller manual will give the information on how to do both of these operations. In general, schedule slower ramp rates for thicker pieces in combination with the half hour soak. This means for each thickness greater than 6mm, the top temperature can be reduced slightly and still achieve a full slump.

The schedules here are applicable for pieces up to 9mm actual thickness.

Slumping of thicker pieces needs to apply the underlying scheduling method:

  • ·        Apply the rate for two layers thicker for the advance to 260°C/500°F.
  • ·        Continue the next ramp rate as for two layers thicker than calculated up to the slumping temperature.
  • ·        For annealing, also select the rates and times for one layer thicker than indicated by the profile.

For example:

  • ·        Rounded Tack of Bullseye, 12mm/0.5” thickness
  • ·        Schedule for 25mm/1” (2 times multiplier)

Celsius schedule for up to 9mm actual thickness:

Segment >

1

2

3

4

5

6

7

Rate

150

150

ASAP

15

27

90

off

Temp

260

Top

482

427

370

RT

 

Time(mins)

20

30

240

0

0

0

 

and in Fahrenheit:

Segment >

1

2

3

4

5

6

7

Rate

270

270

ASAP

27

49

162

off

Temp

500

Top

900

800

700

RT

 

Time(mins)

20

30

240

0

0

0

 

 

A further example:

  • ·        Sharp Tack of Bullseye, 0.5” thickness
  • ·        Schedule for 31mm/1.25” (2.5 times multiplier)

Celsius schedule for up to 9mm actual thickness:

Segment >

1

2

3

4

5

6

7

Rate

78

78

ASAP

11

20

65

off

Temp

260

Top

482

427

370

RT

 

Time(mins)

20

30

300

0

0

0

 

and in Fahrenheit:

Segment >

1

2

3

4

5

6

7

Rate

140

140

ASAP

20

36

117

off

Temp

500

Top

900

800

700

RT

 

Time(mins)

20

30

300

0

0

0

 

 

These examples show that considerable differences in scheduling are needed for different tack profiles. It also shows longer annealing soaks and slower cooling rates are required for sharp than rounded tack pieces.


More information is given in the e-book Low TemperatureKilnforming. 

* Of course, the slumping temperature will be altered for the glass according to the manufacturer’s stated range. The nature of the mould will also have a big effect on temperature and time.

No comments:

Post a Comment