Glass Tips from Verrier

Information on stained glass, fusing, kilnforming and glass working

Showing posts with label Checker board construction. Show all posts
Showing posts with label Checker board construction. Show all posts
Wednesday, 8 July 2026

Breaks in Slumping

›
Despite not opening the kiln until it was 120 degrees, a ¾" crack formed in the middle of a 15" x 15" flat fused 1/4 ” slum...
›
Home
View web version
Powered by Blogger.